- Does digital tracking change duty of care, or only the record?
Duty of care under section 34 is unchanged on 1 October 2026. What changes is the record: a digital receipt for every load, due in two working days.
- A twelve-week plan to get a one-site yard ready for digital waste tracking
A week-by-week readiness checklist for a one-site skip yard: permit details, EWC codes, one tablet, a fortnight of double running, the paper book away.
- The October 2026 start date: what is confirmed, and what to keep watching
The start date operators are planning around is October 2026. Here is what GOV.UK actually says, the April 2025 target that slipped, and what to watch.
- The start date has moved before: how to prepare without betting on one date
The digital waste tracking start date has slipped once already. Here is how a small skip yard prepares in a way that holds up whichever way the date lands.
- Does digital waste tracking apply in Scotland, Wales and Northern Ireland?
Digital waste tracking covers all four UK nations. Which regulator covers which, where the guidance differs, and what a cross-border load needs.
- Has the digital waste tracking start date moved again?
Digital waste tracking has slipped before. The dates announced since 2018, why they moved, and the four signals operators should watch.